Description
OEC 9800 C-Arm (remanufactured)
All OEC 9800 systems go through a multi-step remanufacturing process.Each unit is restored to a like-new status. Pain Management, Orthopedic and Rehabilitation Services are just a few of the applications utilizing the remanufactured OEC 9800 C-arm. The rotating anode allows for greater penetration and resolution for the lumbar area, when performing needle localizations or other work involving thicker anatomical areas. The 1K X 1K CCD technology used in the OEC 9800 image system allows for crisp, clear imaging. For whatever the purpose, a remanufactured OEC 9800 will deliver the results you can depend on.
Technical Specifications
Generator
- High frequency generator 15kW full-wave
- Up to 120 KVP and 75MA for radiographic exposures
- Continuous fluro-mode up to 20 mA
- One shot frame integration (low,medium, high)
- Full power from standard 110V 15A Or 220V 8A outlet
- Patented energy buffer design X-Ray Tube
- Rotating anode X-ray tube
- Focal spots: 0.3 – 0.6 mm
- 300,000 HU Anode heat capacity
Physical Specifications
- Free Space in Arc – 31”
- Depth of Arc: 26”
- Arc orbital movement: 115 Degrees
- Left/Right wig-wag scan:+/- 20 degrees
- Vertical Travel: 18” motorized
- Horizontal travel: 8”
- Lateral rotation: +/- 180 degrees
C-arm Dimensions
- Length: 75.9”
- Height 69.9”
- Width: 33”
Workstation Dimensions
- Width: 27”
- Height 64”
- Depth: 27”
Mechanical repairs/cosmetic maintenance
- All defective parts and covers are repaired or replaced.
- C-arm is completely disassembled and repainted.
- “C” is removed from main frame assembly.
- Horizontal arm removed, inspected and repaired as necessary.
- Vertical column removed and bearings removed inspected and replaced as required.
- X-ray tube removed and inspected for artifacts and internal integrity.
- Image intensifier removed and inspected for any imperfections and grid integrity.
- Camera removed.
- Wheels removed, cleaned and or replaced from main chassis.
- Chassis inspected for structural defects and repaired as necessary.
- Vertical lift assembly is tested for drift and adjusted/replaced if necessary.
- All bearings are inspected, cleaned and re-lubricated, or replaced as needed.
- Control panel display is tested and replaced if necessary.
- All wheels are inspected and lubricated and/or replaced as needed, with new cable pushers installed.
- All locks and brake assemblies are inspected, cleaned, and repaired or replaced as needed.
- C-arm is completely disassembled and repainted.
- Steering is tested and adjusted as required.
- Foot switch and hand switch provided on each unit.
- A complete set of operator and service manuals are provided.
Re-assembly
- All components sent to C-arm reassembly area for rebuilding.
- “C”, Image tube and camera, main control and power cable installed.
- New batteries are installed.
- New CRT monitors installed in monitor cart.
- Monitor cart rebuilt.
- When C-arm is completely rebuilt mechanically, system is sent for calibration and final testing.
Testing/calibration
- Image intensifier and X-ray tube are tested for stability and balance.
- Image intensifier is tested for resolution and gain to be within OEM specifications.
- X-ray tube bearings are tested for noise and coast time.
- X-ray tube filaments and stator windings are tested.
- X-ray tube radiation output is verified to be within OEM specifications.
- X-ray generator high voltage tested.
- Maximum dose rate is set in compliance with government regulations.
- CCD camera calibrated to OEM specifications.
- X-ray beam is aligned for each field size.
- C-arm is tested for current leak-age requirements.
- All monitors are aligned, resized, centered and focused.
- All monitors are adjusted for brightness and linearity.
- Video system is optimized for gray scale and resolution.
- All power supplies are tested and calibrated or replaced as necessary.